by Tieme | Jan 12, 2026 | Projects
Challenge The Maeslantkering is a crucial part of Dutch water safety and must function reliably under all circumstances. The existing stainless steel cable carrier exposed to an aggressive environment with moisture, salt, and varying...
by Tieme | Jan 12, 2026 | Projects
Challenge Sand extraction cranes operate continuously under harsh conditions such as moisture, contamination, and constant movement. For VTS Technical Group, it was essential that the crane's cable routing continued to function reliably. Insufficient protection or...
by Tieme | Jan 12, 2026 | Projects
Challenge At ECT Euromax in Rotterdam, container cranes are used intensively under harsh conditions, such as high loads, long travel distances, and continuous movements. This requires extremely reliable cable track systems. Outdated or insufficiently robust...
by Tieme | Aug 28, 2025 | Projects
Challenge Contargo's container cranes in Ludwigshafen faced challenges related to wear and tear and outdated Cable carriers. This led to increased maintenance requirements and the risk of unplanned downtime, which had a direct impact on efficiency...
by Tieme | Aug 28, 2025 | Projects
Challenge At Tata Steel, many of the installations operate continuously and there are constantly moving applications, where Cable carriers, mainly from the Kabelschlepp brand, are essential for guiding and protecting cables and pipes. The heavy...
by Tieme | Aug 28, 2025 | Projects
Challenge The world's largest and most modern Ferris wheel, located in the iconic city of Dubai, required an advanced cable management system. With its immense scale and technical complexity, this project called for a reliable solution for the...