Project · Cranes & ports

Cable carrier with channel, installation and maintenance at ECT Barge Terminal Venlo

At ECT Barge Terminal Venlo, Wisman Techniek supplied a cable carrier with the matching accessories, such as the channel, installed it and carries out the maintenance and inspections.

Cable carrier in the channel along the crane bridge, above the container terminal
Customer
ECT Barge Terminal Venlo
Sector
Cranes & ports
Region
Venlo
Solution
Cable carriers

01 · Challenge

Challenge

The container crane at ECT Barge Terminal Venlo needs reliable cable guidance over the long travel of the crane that keeps working well in the long term.

02 · Solution

Solution

Wisman Techniek supplied the cable carrier with the matching accessories, such as the channel, and installed everything on the crane.

03 · Result

Result

Wisman Techniek stays involved after the installation as well: we carry out the maintenance and inspections of the cable carrier.

Photos · 5

The project in pictures

Similar project

A comparable
challenge?

Describe your application. We think along on the right cable carrier, dress pack or cable entry and calculate it for you free of charge.

Call a specialist
Grego ErnstTieme ErnstOlaf OttenBas EgberinkDaan van Weeghel

11 specialists in Ruurlo
You speak directly to someone who knows.