Offshore & wind energy.Where downtime is most expensive.

At sea, every fault is an expensive trip. Cable guidance on platforms, turbines and installation vessels has to work in salt, cold and storms, and maintenance has to be plannable.

offshore platform op zee

Kabelmanagement in offshore & wind energy

What does offshore & wind energy demand from industrial cable management?

Typical: Motion-compensated gangways · Offshore cranes · Pipe handling on drilling platforms · Turbine maintenance systems · Cable-laying vessels

  1. 01

    Extreme conditions

    Salt, moisture, cold and wind all at once.

  2. 02

    Heavy packages

    Thick power cables and hydraulic hoses.

  3. 03

    Unreachable

    Maintenance is only possible in planned windows.

  4. 04

    Safety

    Faults directly affect people and installations.

In practice

Offshore & wind energy in practice

All projects
Steel cable carrier on the HelWin Beta offshore platform

Featured project

Cable carriers for TenneT's HelWin Beta offshore platform

For TenneT's HelWin Beta converter platform, we engineered and supplied the cable carriers that allow the cables on the platform to move safely. Out at sea, in salt, wind and weather, where maintenance is difficult and expensive.

Customer
TenneT
Location
North Sea
Sector
Offshore
Solution
Cable carriers
Environment
Offshore, salt, wind and weather
Assembly
Installed on the platform; engineering and supply by Wisman
Read the project

Trusted by

  • Lely
  • Canon
  • Hutchison Ports ECT Rotterdam
  • Tata Steel
  • Central government
  • VDL

Downloads and tools

Everything to take it further yourself

The offshore & wind energy flyer to share, and the tools to calculate and choose yourself.

WISMAN-BELOFTE · RUURLO · SINDS 1975 ·The Wisman promiseFour fixed commitments on every order, from a checked configuration to one dedicated point of contact.

Free
drawing check.
We look along with you.

Send your machine drawing or photo, our engineers will take a look within 1 working day. A sketch, a STEP model or a photo of the machine is enough to get started.

What you get back

  • Which cable carrier, dress pack or cables suit your application
  • Points of attention in the layout or installation
  • A proposal or the logical next step
Bas Egberink

Bas EgberinkCable Carriers Specialist. Your drawing goes straight to him.

We use you details and files only for this check. See our privacy statement.

Frequently asked questions

About offshore & wind energy