Hydraulic engineering & infrastructure.Built to last for decades.
Movable bridges, lock gates and barriers must work reliably for decades, outdoors, in all weather and water. The energy supply is a critical part of that.

Kabelmanagement in hydraulic engineering & infrastructure
What does hydraulic engineering & infrastructure demand from industrial cable management?
Typical: Movable bridges · Lock gates · Storm surge barriers · Pumping stations · Tunnel engineering
01Service life
Installations must last for decades.
- 02
Weather and water
Rain, frost and sometimes under water.
- 03
Large dimensions
Long travel lengths and heavy cables.
- 04
Availability
A bridge or lock that does not work blocks the traffic.
Products
What we supply for hydraulic engineering & infrastructure
Per product why it fits here, and what we do for you alongside it. From advice to installation, with one point of contact.

Tsubaki Kabelschlepp
Plastic cable carriers
- Why it fits
- For machine building, handling and automation.
- What we do
- We calculate the series and supply the carrier fully assembled from Ruurlo.

Tsubaki Kabelschlepp
Steel cable carriers
- Why it fits
- For cranes, steel industry, offshore and machines with large self-supporting lengths.
- What we do
- We calculate unsupported length and load, and install on site.

Tsubaki Kabelschlepp · TRAXLINE
Flexible cables (TRAXLINE)
- Why it fits
- TRAXLINE cables from Tsubaki Kabelschlepp are developed for continuous movement in cable carriers.
- What we do
- We select the cable by bending cycles and radius and cut and assemble it to length.

Detas Ultra
Cable entries
- Why it fits
- Cables sealed into the cabinet, with connectors too.
- What we do
- We plan the entry per cabinet and supply from stock.
In practice
Hydraulic engineering & infrastructure in practice

Featured project
Maeslantkering stainless steel cable carrier overhaul: service life extended
Instead of replacing the stainless steel cable carrier of the Maeslantkering, we overhauled it together with Hollandia Services: fully dismantled, inspected, cleaned and renewed where necessary.
- Customer
- Maeslantkering, with Hollandia Services
- Location
- Hoek van Holland
- Sector
- Infrastructure
- Solution
- Service
- Environment
- Flood barrier, moisture and salt water
- Assembly
- Complete dismantling, overhaul and reassembly
Trusted by
Downloads and tools
Everything to take it further yourself
The hydraulic engineering & infrastructure flyer to share, and the tools to calculate and choose yourself.
Flyer · pdf
Cable management for hydraulic engineering & infrastructure
All solutions for this industry on one A4, to share with your team.
Free
drawing check.
We look along with you.
Send your machine drawing or photo, our engineers will take a look within 1 working day. A sketch, a STEP model or a photo of the machine is enough to get started.
What you get back
- Which cable carrier, dress pack or cables suit your application
- Points of attention in the layout or installation
- A proposal or the logical next step

Bas EgberinkCable Carriers Specialist. Your drawing goes straight to him.
Frequently asked questions







